SITE VISITS:
07 15 2006
09 18 2006   >
09 19 2006   >
09 20 2006   >
09 21 2006   >
09 22 2006   >
09 26 2006   >
09 28 2006   >

10 04 2006   >
10 05 2006   >
10 10 2006   >
10 12 2006   >
10 17 2006   >
10 20 2006   >
10 30 2006   >
11 03 2006   >
 
11 03 2006  ROCKS AND BENCHES >
First the rocks are brought into the centre of the site with a conveyor belt to be roughly placed. Then, each rock is carefully hand placed to fit snug and lay fairly flat. The rocks and concrete will be power washed in the spring when the temperature stays above freezing. 
figureground studio
prairie wind
construction