SITE VISITS:
07 15 2006
09 18 2006
>
09 19 2006
>
09 20 2006
>
09 21 2006
>
09 22 2006
>
09 26 2006
>
09 28 2006
>
10 04 2006
>
10 05 2006
>
10 10 2006
>
10 12 2006
>
10 17 2006
>
10 20 2006
>
10 30 2006
>
11 03 2006
>
09 28 2006 >
While the concrete slab cures, work begins on the grading of the rest of the site. Gravel and sand is brought in to get the site up to the proper level. Notice the leaves are changing.
figureground studio
prairie wind
construction