09 18 2006 >
Here are some shots of the anchor bolts that will
be cast in the concrete slab. Form
work for the concrete slab is getting built. The
concrete piles are poking out of the ground - there are four of them.
It's hard to believe by looking at them here but each pile
goes down 8m into the ground.