SITE VISITS:
07 15 2006
09 18 2006   >
09 19 2006   >
09 20 2006   >
09 21 2006   >
09 22 2006   >
09 26 2006   >
09 28 2006   >

10 04 2006   >
10 05 2006   >
10 10 2006   >
10 12 2006   >
10 17 2006   >
10 20 2006   >
10 30 2006   >
11 03 2006   >
 
09 28 2006 GRADING WORK >
The site is being brought us to level and the excavation around the slab is filled in. The concrete slab is quietly curing. It will be 28 days before it is fully cured. 
figureground studio
prairie wind
construction